Lake Nona · Bathroom remodeling
Curbless shower primary bath
A dated tub and shower combo replaced with a curbless walk-in shower and a floating walnut vanity.
Project cost$31kTimeline4 weeksPrice changesNone

The project
Carla wanted a bathroom that felt like a hotel and would still work as she gets older. We replaced the tub with a curbless walk-in shower, recessed the floor so there's no step, and waterproofed every wet wall.
A floating walnut double vanity, matte black fixtures and handmade-look tile finish it off. We finished two days ahead of schedule.
What we did
- Tub removal and curbless shower
- Full waterproofing system
- Handmade-look wall tile
- Floating walnut double vanity
- New lighting and exhaust fan
"Jorge answered every text the same day. The bathroom looks like a hotel and they finished two days early."
Planning your own bathroom project?
Free in-home estimates, booking about a week out.


